10.22Welding by gas or electric plant including transportation of plant at site etc. complete.
Matches DSR 2023Vol 1, pages 767 to 768
Rate per cm
3.70
DSR 2023
How this rate is built2 items, 4 additional charges
MaterialWelding by gas plant
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.