Providing and fixing ridges and hips in fibre cement reinforced by organic fibres and/or inorganic synthetic fibres roofing with suitable fixing accessories or self drilling fastener and EPDM washer etc. complete.
12.12.1Corrugated serrated adjustable ridges
Matches DSR 2023Vol 1, pages 897 to 898
Rate per metre
522.95
DSR 2023
How this rate is built6 items, 4 additional charges
MaterialFibre reinforced by organic fibres and/or inorganic synthetic fibres
LabourCarpenter 2nd class, Beldar, Mistry
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.
Unserrated adjustable hips · Providing and fixing ridges and hips in fibre cement reinforced by organic fibres and/or inorganic synthetic fibres roofing with suitable fixing accessories or self drilling fastener and EPDM washer etc. complete.