12.18Extra for every additional 1 cm thickness of mud phaska.
Matches DSR 2023Vol 1, page 908
Rate per sqm
24.20
DSR 2023
How this rate is built4 items, 4 additional charges
MaterialMud (dry)
LabourBhisti, Beldar
Loading
Water 1%GSTCPOH 15%Cess 1%