Finishing walls with textured exterior paint of required shade :
13.110.1Old work (Two or more coats on existing cement paint surface applied @ 3.28 ltr/10 sqm.
Matches DSR 2023Vol 2, pages 1061 to 1062
Rate per sqm
169.20
DSR 2023
How this rate is built6 items, 4 additional charges
MaterialTextured exterior paint
LabourCoolie, Painter
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.