13.1312 mm cement plaster 1:2 (1 cement : 2 stone dust).
Matches DSR 2023Vol 2, page 996
Rate per sqm
378.70
DSR 2023
How this rate is built5 items, 4 additional charges
MaterialPortland Cement (OPC-43 Grade), Stone dust, Carriage of Cement, Carriage of Stone dust
LabourBhisti, Beldar, Coolie, Mason (average)
Built from1 other item in this book
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.