14.76Cleaning and desilting of gully trap chamber, including removal of rubbish mixed with earth etc. and disposal of same, all as per the direction of Engineer-in-charge.
Matches DSR 2023Vol 2, page 1117
Rate per each
108.30
DSR 2023
How this rate is built2 items, 4 additional charges
LabourSewer man
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.