Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge :
15.44.115 mm to 40 mm nominal bore
Matches DSR 2023Vol 2, pages 1161 to 1162