15.6Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work.
Matches DSR 2023Vol 2, page 1135
Rate per kg
9.05
DSR 2023
How this rate is built3 items, 4 additional charges
LabourBlacksmith 2nd class, Beldar
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.