Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured):
15.8.1From brick work in mud mortar
Matches DSR 2023Vol 2, page 1137
Rate per 1000 Nos
4,658.45
DSR 2023
How this rate is built4 items, 4 additional charges
LabourBeldar, Coolie, Mason 2nd class
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.
In lime mortar · Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :