16.52XSub Analysis X for sub analysis item Number 16.52Y
Vol 2, page 1259
Rate per cum
2,665.15
DSR 2023
How this rate is built10 items, 0 additional charges
MaterialUnslaked lime, Coarse sand (zone III), Fly ash, Carriage of Coarse sand, Carriage of Lime, Carriage of Surkhi
LabourBhisti, Beldar
Loading
View full rate analysis
See every quantity and rate, and the 0 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.