75 mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with :
16.74.1Moorum
Matches DSR 2023Vol 2, page 1301
Rate per sqm
76.30
DSR 2023
How this rate is built4 items, 4 additional charges
MaterialMoorum, Carriage of Moorum
LabourBhisti, Beldar
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.