16.77Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material within all lifts and lead upto 1km (by mechanical means).
Matches DSR 2023Vol 2, page 1304
Rate per sqm
7.00
DSR 2023
How this rate is built5 items, 4 additional charges
LabourBeldar, Mate
MachineryFront end loader capacity 1.00 cum, Hire and running charges of tipper, Tractor with ripper attachment
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.
With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 · Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.