18.14Fixing water meter and stop cock in G.I. pipe line including cutting and threading the pipe and making long screws etc. complete (cost of water meter and stop cock to be paid separately).
Matches DSR 2023Vol 2, pages 1485 to 1486
Rate per each
812.30
DSR 2023
How this rate is built4 items, 4 additional charges
MaterialG.I. back (jam) nuts 25 mm dia
LabourBeldar, Fitter (grade 1)
Loading
Water 1%GSTCPOH 15%Cess 1%