18.23Laying in position centrifugally cast (spun) iron S&S or flanged pipes (excluding cost of pipe).
Matches DSR 2023Vol 2, page 1498
Rate per quintal
361.65
DSR 2023
How this rate is built4 items, 4 additional charges
LabourBeldar, Fitter (grade 1), Assistant Fitter or 2nd class Fitter
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.