Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete. (Measurements to be taken of the face area timbered).
2.17.1Depth not exceeding 1.5 m
Matches DSR 2023Vol 1, page 113