Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete (Measurements to be taken of the face area timbered):
2.21.2Depth exceeding 1.5 m but not exceeding 3 m
Matches DSR 2023Vol 1, page 124
Rate per sqm
81.65
DSR 2023
How this rate is built7 items, 4 additional charges
MaterialSafeda ballies 125 mm diameter, Second class kail wood in scantling 10, Second class kail wood in planks 10, Carriage of Timber
LabourCarpenter 2nd class, Beldar
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.
Depth exceeding 1.5 m but not exceeding 3 m · Open timbering over areas including strutting, shoring etc. complete. (Measurements to be taken of the face area timbered):