Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
2.7.3Hard rock (blasting prohibited)
Matches DSR 2023Vol 1, page 97
Rate per cum
1,432.95
DSR 2023
How this rate is built9 items, 4 additional charges
LabourBlacksmith 2nd class, Beldar, Coolie, Rock Excavator, Rock Breaker, Stone Chiseller
MachineryHire and running charges of tipper, Hydraulic Excavator (3D) with driver and fuel
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.
Ordinary rock · Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.