How this rate is built1 item, 4 additional charges
MaterialCyclic vertical load testing of piles in accordance with IS : 2911 (Part-per
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.