How this rate is built7 items, 4 additional charges
MaterialWater supply tanker of 5000 litre capacity
LabourChowkidar, Beldar, Mistry
MachineryHire charges of Diesel Truck - 9 tonne (with POL), Hydraulic Excavator (3D) with driver and fuel
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.