23.6Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.
Matches DSR 2023Vol 2, pages 1939 to 1940
Rate per cum
1,538.25
DSR 2023
How this rate is built3 items, 4 additional charges
MaterialGravel 5 mm to 10 mm
LabourBeldar
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.