Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).
26.32.225 mm average thickness in 2 layers.
Matches DSR 2023Vol 2, page 2015
Rate per sqm
587.35
DSR 2023
How this rate is built6 items, 4 additional charges
MaterialPortland Cement (OPC-43 Grade), Coarse sand (zone III), Carriage of Coarse sand, Carriage of Cement, SBR Polymer
LabourBhisti, Beldar, Coolie, Mason (average)
Built from1 other item in this book
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.