5.26Providing and filling in position, blown bitumen in expansion joints.
Matches DSR 2023Vol 1, pages 282 to 283
Rate per cum
74,854.65
DSR 2023
How this rate is built8 items, 4 additional charges
MaterialBlown type petroleum bitumen of penetration 85/25 of approved, Coal (steam), Carriage of Steam coal, Carriage of Tar / Bitumen
LabourBeldar, Mason 1st class, Mason 2nd class
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.