5.32Extra for laying reinforced cement concrete in or under foul positions.
Matches DSR 2023Vol 1, pages 288 to 289
Rate per cum
467.55
DSR 2023
How this rate is built4 items, 4 additional charges
LabourBeldar, Coolie, Mason 1st class, Mason 2nd class
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.