Centering and shuttering including strutting, propping etc. and removal of form for
5.9.6Columns, Pillars, Piers, Abutments, Posts and Struts
Matches DSR 2023Vol 1, page 235
Rate per sqm
961.30
DSR 2023
How this rate is built10 items, 4 additional charges
MaterialWall form panel 1250x450 mm, Corner angle 45x45x5 mm 2.50 m long, Column clamp 450x1070 mm, Prop 2 m ( 2-3.5 m)
LabourBeldar, Fitter (grade 1)
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.