6.14Extra for half brick masonry in superstructure, above floor V level for every four floors or part thereof by mechanical means.
Matches DSR 2023Vol 1, page 336
Rate per sqm
15.00
DSR 2023
How this rate is built1 item, 4 additional charges
MachineryMobile crane
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis