1.3Loading in or unloading cement from the railway wagons at siding and carrying the same from or into godowns adjacent to the siding, including stacking the same properly in rows upto any height as per direction of Engineer-in-charge, sweeping the wagons and screening the swept cement and filling in bags complete.
Vol 1, page 88
Rate per tonne
169.40
DSR 2023
How this rate is built2 items, 3 additional charges
LabourBeldar
Loading
GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 3 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.