Loading in or unloading from the railway wagons as per direction of Engineer-in-charge :
1.4.2G.I., C.I., R.C.C. or C.C. pipes upto 500 mm dia and similar heavy materials
Vol 1, page 89
Rate per tonne
148.80
DSR 2023
How this rate is built2 items, 3 additional charges
LabourBeldar
Loading
GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 3 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.