Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional height of one metre or part thereof beyond 5 metres :
15.16.2Of sectional area below 40 square centimetres
Matches DSR 2023Vol 2, page 1145
Rate per height
3.40
DSR 2023
How this rate is built3 items, 4 additional charges
LabourBlacksmith 2nd class, Beldar
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.