Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in:
15.17.2Channels, angles, tees and flats
Matches DSR 2023Vol 2, page 1146
Rate per kg
2.30
DSR 2023
How this rate is built4 items, 4 additional charges
LabourBandhani, Blacksmith 2nd class, Beldar
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.