15.27Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Matches DSR 2023Vol 2, page 1150
Rate per cum
914.30
DSR 2023
How this rate is built3 items, 4 additional charges
LabourBeldar, Coolie
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.