15.37Dismantling wooden trellis work excluding frames but including stacking the serviceable material within 50 metres lead.
Matches DSR 2023Vol 2, pages 1155 to 1156
Rate per sqm
64.85
DSR 2023
How this rate is built4 items, 4 additional charges
LabourBeldar, Coolie, Mason 2nd class
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.