15.35Cutting ballies or wooden posts of fencing at the point of projection above the concrete or ground and stacking the same within 50 metres lead.
Matches DSR 2023Vol 2, page 1155
Rate per each
13.45
DSR 2023
How this rate is built2 items, 4 additional charges
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.