15.41Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead.
Matches DSR 2023Vol 2, pages 1158 to 1159
Rate per sqm
56.35
DSR 2023
How this rate is built3 items, 4 additional charges
LabourCarpenter 2nd class, Beldar
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.