Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead :
15.42.2100 mm dia pipe
Matches DSR 2023Vol 2, pages 1159 to 1160
Rate per metre
78.00
DSR 2023
How this rate is built3 items, 4 additional charges
LabourBeldar, Coolie
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.
· Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :