15.49Taking out C.I. cover with frame from R.C.C. top slab of inspection chambers of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge.
Matches DSR 2023Vol 2, pages 1167 to 1168
Rate per each
406.75
DSR 2023
How this rate is built4 items, 4 additional charges
LabourBeldar, Coolie