15.50Dismantling of R.C.C. spun vent shaft including excavating the cement concrete pit completely, taking out the shaft, refilling the excavated gap, stacking the useful materials near the site and disposal of unserviceable materials within 50 metres lead.
Matches DSR 2023Vol 2, pages 1168 to 1169
Rate per each
4,623.70
DSR 2023
How this rate is built12 items, 4 additional charges
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.