Open timbering over areas including strutting, shoring etc. complete. (Measurements to be taken of the face area timbered):
2.22.3Depth exceeding 3 m but not exceeding 4.5 m
Matches DSR 2023Vol 1, pages 127 to 128
Rate per sqm
71.30
DSR 2023
How this rate is built6 items, 4 additional charges
MaterialSafeda ballies 125 mm diameter, Second class kail wood in planks 10, Carriage of Timber
LabourCarpenter 2nd class, Beldar
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.