Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push-pull jacks & all another T & P for lifting Placing & Alignment of elements, within erection tolerance as per IS 15916 as per approved shop drawings and all complete as per the direction of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout and steel works i.e hangers. All work up to fifth floor.
26.77.3Solid concrete wall elements
Matches DSR 2023Vol 2, pages 2083 to 2084
Rate per cum
2,720.30
DSR 2023
How this rate is built13 items, 4 additional charges
MaterialErection Bolts ( Minimum 04 nos for each element)