5.38Extra for R.C.C./ B.M.C/ R.M.C. work above floor V level for each four floors or part thereof.
Matches DSR 2023Vol 1, page 302
Rate per cum
355.65
DSR 2023
How this rate is built1 item, 4 additional charges
MachineryPumping charges of concrete including Hire charges of pump, piping
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.