6.25Extra for laying brick work in or under foul position.
Matches DSR 2023Vol 1, page 342
Rate per cum
467.55
DSR 2023
How this rate is built4 items, 4 additional charges
LabourBeldar, Coolie, Mason 1st class, Mason 2nd class
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.