Stone work ashlar sunk or moulded or sunk and moulded upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade :
7.20.2White sand stone
Matches DSR 2023Vol 1, pages 389 to 390
Rate per cum
1,08,686.00
DSR 2023
How this rate is built17 items, 4 additional charges
MaterialWhite sand stone block 10, Carriage of Stone blocks white & red sand stone & kota stone slab
LabourBandhani, Bhisti, Blacksmith 1st class, Beldar, Coolie, Mason (for plain stone work) 2nd class
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.