Extra for stone work ashlar sunk or moulded or sunk and moulded or carved in :
7.21.2Circular or polygonal pillars
Matches DSR 2023Vol 1, pages 390 to 391
Rate per cum
10,706.00
DSR 2023
How this rate is built1 item, 4 additional charges
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.