7.24Extra for stone work (veneer work) curved on plan with a mean radius not exceeding 6 m.
Matches DSR 2023Vol 1, page 391
Rate per cum
2,896.00
DSR 2023
How this rate is built1 item, 4 additional charges
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.