2.36Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge.
Matches DSR 2023Vol 1, page 141
Rate per cum
93.05
DSR 2023
How this rate is built2 items, 4 additional charges
LabourCoolie, Mate
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.