2.37Supply and stacking of Fly ash conforming to IRC- 58 at site, including carriage, loading , unloading & stacking up to any lead (measured stacks will be reduced by 20% for payment).
Matches DSR 2023Vol 1, pages 141 to 142
Rate per cum
281.05
DSR 2023
How this rate is built2 items, 4 additional charges
MaterialFly ash, Carriage of Flyash
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.