4.14Extra for concrete work in superstructure above floor V level for each four floors or part thereof by mechnical means.
Matches DSR 2023Vol 1, page 194
Rate per cum
169.45
DSR 2023
How this rate is built1 item, 4 additional charges
MachineryMobile crane
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis