4.16Extra for laying concrete in or under foul positions.
Matches DSR 2023Vol 1, pages 194 to 195
Rate per cum
467.55
DSR 2023
How this rate is built4 items, 4 additional charges
LabourBeldar, Coolie, Mason 1st class, Mason 2nd class
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.
Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 6 graded stone aggregate 20 mm nominal size Recycled Aggregate (RA) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth