4.15Extra for laying concrete in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete.
Matches DSR 2023Vol 1, page 194
Rate per depth
1,098.80
DSR 2023
How this rate is built2 items, 4 additional charges
LabourBeldar
MachineryHire charges of Pump set of capacity 4000 litres/hour
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.