Extra for additional labour for circular works, such as in frames of fan light
9.4.3Kiln seasoned and chemically treated hollock wood
Matches DSR 2023Vol 1, page 464
Rate per cum
8,338.10
DSR 2023
How this rate is built6 items, 4 additional charges
MaterialCarriage of Timber, Hollock wood in scantling 10, Kiln seasoning of timber
LabourBeldar, Carpenter (average)
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.