15.20Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional span of one metre or part thereof beyond 10 metres
Matches DSR 2023Vol 2, page 1147
Rate per span
0.85
DSR 2023
How this rate is built3 items, 4 additional charges
LabourBandhani, Beldar
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.